The method

Eleven stages.
None of them guesswork.

Each stage answers a specific decision, has a defined scope and one person responsible for it. They can be followed from beginning to end or commissioned independently, depending on where the project stands.

Working with SSØT
Stage 01

Discovery

A first conversation to understand the aim of the project, the stage it has reached, who the user will be, what spaces exist and the schedule and investment being worked to. We do not arrive with a solution prepared in advance: the project has to be understood first.

Stage 02

Analysis

We go through drawings, surveys, images, specifications, existing services and technical constraints, alongside the operational requirements, the positioning of the property and the experience you want to create. Where it helps, we visit the space.

Stage 03

Wellness strategy

We define which solutions add most value to this particular project: overall concept, type of experiences, user journey and priorities. We set the level of customisation, the technical requirements and, where it makes sense, the phases of delivery.

Stage 04

Design and definition

We develop the chosen proposal and coordinate the engineering: layouts, equipment selection, specifications, materials, installation requirements, power, consumption and hydraulic and ventilation needs, all integrated with the architecture.

Stage 05

Quotation and planning

The commercial proposal and programme, setting out the equipment and services included, the exclusions, the payment terms, the estimated lead times, the prerequisites, who is responsible for what and the warranties.

Stage 06

Coordination

We coordinate our work with the client, the project management, architecture, interior design, engineering, the main contractor, installers, maintenance and hotel operations. The aim is to detect incompatibilities before they reach site, which is where correcting them becomes most expensive.

Stage 07

Production and supply

We handle ordering, manufacture, follow-up, logistics, transport, delivery and inspection of materials, reporting at every milestone. Special equipment, bespoke cabins and integrated systems take weeks or months to build, and are planned as such.

Stage 08

Installation

We carry out or supervise the installation within our scope. Beforehand we check that the space and the first-fix services are genuinely ready, and we fit our work around the pace of the other trades on site.

Stage 09

Commissioning

Testing, checks, adjustments, programming, safety verification and resolution of the early snags. We do not close this stage until the installation behaves exactly as it was designed to.

Stage 10

Training and handover

We explain to the team in charge how to use and care for the installation: starting up and shutting down, operating programmes, cleaning, preventive maintenance, identifying faults and safety measures. We hand over manuals, technical data sheets, warranties, protocols and a support contact.

Stage 11

Ongoing support

After handover we remain available for questions, faults, maintenance, spare parts, warranties, improvements, extensions and further phases of the project.

01 / 11
Scroll
Hydrotherapy circuit with waterfalls and massage jets in the spa at Hotel Es Princep

“True wellbeing begins when every element finds its purpose.”

Before we start

Tell us about the project and we will tell you what it needs.

A first conversation to understand the space, its intended use and the experience sought. From there we define what makes sense to include, what is best avoided and how to order each decision.